Factory supplier black iron round mild erw steel pipe welded pipes and tubes 377

Availability: In Stock
Introduce:High tensile strength Anti-corrosion High temperature resistence High quality
Min.Order Quantity: 1 Ton
Payment Terms: L/C,T/T,Western Union

Contact Supplier

Email: contact@baobingroup.com
Tel: +86-21-67602066
Essential details
Place of Origin:
Shanghai, China
Brand Name:
BAOBIN STEEL
Application:
Other
Alloy Or Not:
Is Alloy
Section Shape:
Round
Special Pipe:
Shock Absorb Pipe
Outer Diameter:
10 - 120 mm
Thickness:
2.1 - 3.75 mm
Standard:
JIS
Length:
12M, 6m, 6.4M, Length
Certificate:
SASO, JIS
Technique:
ERW
Grade:
Q235, Q235B, S275, S275jr, A53, st37
Surface Treatment:
Hot Rolled
Tolerance:
±1%
Processing Service:
Cutting
Oiled or Non-oiled:
Slightly Oiled
Invoicing:
by theoretical weight
Delivery Time:
15-21 days
Product name:
welded steel pipes
MOQ:
1 Ton
Surface:
other
Keyword:
Welded pipe
Shape:
circular
Package:
Standard Seaworthy Package
Surface finish:
2B
Company Type:
Manyfactory

Type Seamless carbon steel pipe / Welded Steel Pipe
Materials API 5L /A53 /A106 GRADE B and other material which client inquired
Size Outer Diameter Seamless:17-914mm 3/8"-36"
Wall Thickness SCH10 SCH20 SCH30 STD SCH40 SCH60 XS SCH80
SCH100 SCH120 SCH140 SCH160 XXS
Length Single random length/Double random length
5m-14m,5.8m,6m,10m-12m,12m or as customer's actual request
Ends Plain end/Beveled,protected by plastic caps on both ends, cut quare,grooved,threaded and coupling,etc.
Surface Treatment Bare,Painting black,varnished,galvanized,anti-corrosion 3PE PP/EP/FBE coating
Technical Methods Hot-rolled/Cold-drawn/Hot-expanded
Testing Methods Pressure test,Flaw detection,Eddy current testing, Hydro static testing or Ultrasonic examination and also with chemical and
physical property inspection
Packaging Small pipes in bundles with strong steel strips,large pieces in loose; Covered with plastic woven
bags; Wooden cases;Suitable for lifting operation;Loaded in 20ft 40ft or 45ft container or in bulk;
Also according to customer's requests
Origin China
Application Conveying oil gas and water
Third Party Inspection SGS BV MTC
Trade Terms FOB CIF CFR
Payment Terms FOB 30%T/T,70% before shipment
CIF 30% pre-payment and the balance to be paid before making shipment
or Irrevocable 100% L/C at sight
MOQ 10 tons
Supply Capacity 5000 T/M
Delivery Time Usually within 10-45 days after receipt of advance payment

Contact us(And our MOQ is 1ton)